Back to devices
- Faculty
- Engineering
- Department
- Mechatronics Engineering Department
- Laboratory
- Mechatronics Control System
- Device Type
- Measuring
- Brand
- Feedback
- Count of Devices
- 1
- Device Status
- Working
- Maintenance Type
- No maintenance
- Guarantee
- No
- Responsible Person
- Mohammed Ibrahim Awad
Description
The combined PROCON Level/Flow and Temperature Process Control System is self-contained and has all of the features of the individual Level/Flow and Temperature systems plus Remote Set Point Control. Remote Set-Point Control can be affected with the PROCO
Function
Process control kit to teach students the closed loop control for process whcih contains flow, fluid level, and/or temperature
| Saturday | Closed |
|---|---|
| Sunday | 09:00 - 15:00 |
| Monday | 09:00 - 15:00 |
| Tuesday | 09:00 - 15:00 |
| Wednesday | 09:00 - 15:00 |
| Thursday | 09:00 - 15:00 |
| Friday | Closed |
- Reserve at least 1 hour(s) in advance.
- Reservations are open up to 60 days ahead.
- Duration: 30 min - 2 h
Engineering
Process control kit (flow, level and temperature)
Mechatronics Control System
Working
Measuring
100.00 LE
/ hour
1Choose a day
2 Choose your time slot
Reserve a time slot
Sunday, Monday, Tuesday, Wednesday, Thursday, 09:00 - 15:00
Reservation added to your cart.
It is held for 30 minutes, complete the payment to confirm it.
- Opening hours09:00 - 15:00
- Available days Sunday, Monday, Tuesday, Wednesday, Thursday
- ResponsibleMohammed Ibrahim Awad