Engineering

WIND POWER PLANT WITH DFIG

Back to devices
Faculty
Engineering
Department
Electrical Power and Machines Engineering Department
Laboratory
Power Systems Lab
Device Type
Analytical
Brand
Lucas Nulle
Count of Devices
2
Device Status
Working
Maintenance Type
No maintenance
Guarantee
No
Responsible Person
Mohamed El Shimy
Description

The effect of wind force and the mechanical design of wind power stations can be emulated in realistic detail using the servo machine testing stand and the WindSim software. The control unit for the double-feed asynchronous machine (as a generator for the

Function

This wind trainer is used to investigate the design and operation of modern wind power stations with double-fed induction generators.

Saturday Closed
Sunday 09:00 - 15:00
Monday 09:00 - 15:00
Tuesday 09:00 - 15:00
Wednesday 09:00 - 15:00
Thursday 09:00 - 15:00
Friday Closed
  • Reserve at least 1 hour(s) in advance.
  • Reservations are open up to 60 days ahead.
  • Duration: 30 min - 2 h
Engineering

WIND POWER PLANT WITH DFIG

Power Systems Lab
Working Analytical
100.00 LE / hour
1Choose a day
2 Choose your time slot
Reserve a time slot

Sunday, Monday, Tuesday, Wednesday, Thursday, 09:00 - 15:00

Reservation added to your cart.
It is held for 30 minutes, complete the payment to confirm it.
View my cart
  • Opening hours09:00 - 15:00
  • Available days Sunday, Monday, Tuesday, Wednesday, Thursday
  • ResponsibleMohamed El Shimy